Saturday, 7 June 2008

RELUGAS





DORMER WINDOWS
Install steel post system designed by engineers, to reinforce existing roof structure and to take loading from new, large dormer construction. Fabricate laminated beams with mortis and tenon jointing. Roofer to strip slates and sarking and assisting erection of main structure. Timber stud haffits, pitch roof. Sarking board cladding for slates. Install double glazed PVC triple window unit. Roofer to do all external weatherproofing work in felt, slate, lead, etc.

No comments: